Ask for the document that answers it.
DCAP separates verified facts from open questions. The point is not to fill gaps with suspicion. The point is to close the gaps with records.
Project-specific records still needed.
Power
Actual service/interconnection request, proposed MW demand, transmission/substation scope, easements, provider and cost allocation.
Water + wastewater
Cooling technology, average/peak/annual demand, water-right basis, drought assumptions, wastewater receiver and available capacity.
Neighborhood compatibility
Measured distances from buildings and equipment to homes and schools, acoustic modeling, low-frequency/tonal noise, photometrics and generator operations.
Emergency planning
Fire flow, generator fuel, battery systems, HazMat review, first-responder access, training and equipment responsibilities.
Public cost
Road, electrical, utility, emergency-response and other incremental infrastructure costs, plus any incentives or reimbursements.
Cross-jurisdiction coordination
Brighton, Lochbuie and Weld County contacts, written consultation records and any utility, road, sewer or emergency-service agreements.